Brooklyn · local planning notes
Remodeling a rowhouse in Park Slope, Brooklyn
Park Slope has one historic district and two extensions, designated in 1973, 2012 and 2016. Most of its homes are in rowhouses and small walk-ups. Before pricing a kitchen or bathroom, confirm the address's designation and how many legal units the building has.
Part of our Brooklyn service area. Confirm the building authority for your exact address.
What this page covers
This page is for owners of one- and two-family rowhouses in Park Slope, and owners who live in a three- or four-family brownstone, planning kitchen, bathroom or whole-interior work. Park Slope is a Brooklyn neighborhood, so building permits come from the NYC Department of Buildings (DOB). Lot figures are for DCP's Park Slope neighborhood tabulation area (NTA, BK0602), a statistical area built from census tracts, not an official boundary. Structural alterations, additions and new construction are outside the work this page describes.
LPC districts
Three designations under one name
| Designation (LPC number) | Designated | What LPC describes | Buildings (LPC) | Lots with homes (PLUTO) |
|---|---|---|---|---|
| Park Slope Historic District (LP-0709) | July 17, 1973 | An upper tier near the park, the 'Gold Coast', built for the well-to-do, and long blockfronts of rowhouses and low walk-up apartment houses, particularly below Eleventh Street | 1,948 | 1,792 |
| Park Slope Historic District Extension (LP-2443) | April 17, 2012 | About 600 buildings west and south of the 1973 district: mostly single-family row houses, flats buildings (some with stores on Seventh Avenue) and industrial buildings to the south | 613 | 552 |
| Park Slope Historic District Extension II (LP-2558) | April 12, 2016 | 292 buildings around the northern part of the 1973 district, mainly single-family rowhouses and flats buildings; Italianate the most common style | 292 | 225 |
LPC's 2016 press release counts 2,853 protected buildings in Park Slope across the three. In PLUTO, 2,548 of the NTA's 6,464 tax lots with homes (39.4%) carry one of the three names, and another 21 Extension lots fall in the neighboring Windsor Terrace-South Slope NTA. LPC's open dataset lists the 1973 district but not the two extensions as separate rows, so an address search on LPC's Discover NYC Landmarks map is the check, not a district list.
The 2012 and 2016 reports include building profiles, and the 2012 report is organized street by street. Find the entry for your house before planning anything that shows outside: a kitchen or bath vent through the front or rear wall, a replaced window, a new door to the yard. The Brooklyn page sets out which interior work LPC says it reviews.
What the lot data shows
One, two or three-plus families: why the count matters
| Building class (DOF code) | Lots | Share of 6,464 lots with homes |
|---|---|---|
| Two-family converted from one-family (B3) | 1,086 | 16.8% |
| Two-family brick (B1) | 668 | 10.3% |
| One-family city residence (A4) | 402 | 6.2% |
| All one- and two-family classes (A and B) | 2,800 | 43.3% |
| Three-family walk-up (C0) | 1,117 | 17.3% |
| Four-family walk-up (C3) | 357 | 5.5% |
| All walk-up classes (C) | 2,516 | 38.9% |
Walk-up lots hold about 45% of the NTA's homes, and elevator-building lots about 13%. Inside the 1973 district, 53.5% of lots with homes are one- or two-family and 40.1% are walk-ups. So a Park Slope "brownstone" may be a single-family house, a two-family house that was once one, or a three- or four-family building.
That count changes more than the floor plan. The city's housing agency, HPD, treats a building with three or more residential units as a multiple dwelling that must register every year. A one- or two-family house registers only if neither the owner nor the owner's family lives there. Other rules can also depend on the unit count and the Certificate of Occupancy. Before pricing work, check the legal unit count on the CO, if there is one, and ask a design professional which rules follow from it.
PLUTO flags no lot with homes in the NTA on either FEMA flood map. Year-built values before 1940 cover 95% of lots with homes; DCP says the field is accurate only to the decade.
Rowhouse brief: what to write down
- The LPC map result for the address, and which of the three designations it falls in.
- The designation-report entry for the house, if there is one, saved with the brief.
- The legal unit count and floor-by-floor use on the Certificate of Occupancy, including any store or office.
- Which units are occupied during the work, and by whom. A tenant upstairs changes shutoff and noise planning.
- Front-facade items and rear-facade items listed separately from interior finishes: vents, windows, doors to the yard, condensers.
- Shared walls with each neighbor, and any plan that would open or fix to them. Ask a qualified professional first.
Room-by-room planning is on Brooklyn kitchen remodeling, bathroom remodeling in Brooklyn and home renovation in Brooklyn. The two-family home project brief covers planning with a second household in the building, and renovating an older home covers conditions behind old walls.
Permits
Who issues building permits
Every Park Slope address is in Brooklyn, so building permits come from NYC DOB. For a property in the historic district or either extension, LPC says its permit is needed before DOB can act. HPD registration depends on the unit count. This page is not a permit, landmark or legal-use determination.
Services
Sources
- Do I Need a Permit?, NYC Department of Buildings. Accessed 2026-11-08.
- Landmark Status Letter, NYC Landmarks Preservation Commission. Accessed 2026-11-08.
- Permit Types, NYC Landmarks Preservation Commission. Accessed 2026-11-08.
- Historic Districts (dataset skyk-mpzq), NYC Landmarks Preservation Commission via NYC Open Data (rows updated 2026-06-18). Accessed 2026-11-08.
- Park Slope Historic District Designation Report (LP-0709), NYC Landmarks Preservation Commission (1973-07-17). Accessed 2026-11-08.
- Park Slope Historic District Extension Designation Report (LP-2443), NYC Landmarks Preservation Commission (2012-04-17). Accessed 2026-11-08.
- Park Slope Historic District Extension II Designation Report (LP-2558), NYC Landmarks Preservation Commission (2016-04-12). Accessed 2026-11-08.
- Landmarks Preservation Commission Approves New Historic District in Brooklyn, NYC Landmarks Preservation Commission (2016-04-12). Accessed 2026-11-08.
- Register Your Property, NYC Department of Housing Preservation and Development. Accessed 2026-11-08.
- Primary Land Use Tax Lot Output (PLUTO), version 26v2 (dataset 64uk-42ks), NYC Department of City Planning via NYC Open Data (26v2 (rows updated 2026-08-24)). Accessed 2026-11-08.
- PLUTO Data Dictionary (23v1.1), NYC Department of City Planning (2023-05). Accessed 2026-11-08.
- 2020 Census Tracts to 2020 NTAs and CDTAs Equivalency (dataset hm78-6dwm), NYC Department of City Planning via NYC Open Data (2021-09-20). Accessed 2026-11-08.
- The Newest New Yorkers 2026, Chapter 1, NYC Department of City Planning (2026). Accessed 2026-11-08.
Questions
Common questions
Is every Park Slope rowhouse landmarked?
Does it matter whether my brownstone is two-family or three-family?
Services
Remodeling services in Brooklyn
- Kitchen remodeling · Brooklyn Brooklyn kitchen remodeling for rowhouses and pre-war homes Galley and through-room kitchens planned to measured aisle widths
- Bathroom remodeling · Brooklyn Bathroom remodeling in Brooklyn's older houses Layouts planned around the existing drain and vent stack
- Whole-home renovation · Brooklyn Home renovation in Brooklyn's older houses, floor by floor Floor-by-floor plans for narrow attached and rowhouse interiors
General planning information, not a permit determination for any property. Back to Brooklyn.
Blog
Planning articles
- Materials & decisions · Draft A simple selection log for your renovation "White tile" is a preference, not a selection. A short log records the exact item, how settled each choice is and what still needs an answer.
- Kitchens · Draft Cabinet refacing or replacement: what should you compare? Refacing changes what you see; replacement changes the boxes and often the layout. The useful question is which parts of your existing cabinets are worth keeping.
- Whole-home planning · Draft Renovating a two-family home: separate the two project briefs Two units mean two sets of rooms, decisions and occupants. Writing them down separately, with a third list for what the units share, keeps the scope readable for everyone who prices or plans it.
Ready to talk about your project?
Call or email us to talk it through and arrange a consultation.