MMA ConstructionConstruction & Remodeling Call MMA Construction

Flooring

Flooring installation, refinishing and subfloor preparation

We install and refinish floors in New York houses and apartments: hardwood, engineered wood, luxury vinyl plank and tile. Before anything is ordered, our project lead checks what is under the current floor, how flat the subfloor is and where the new heights will meet doors, stairs and adjoining rooms.

Close-up of a polished herringbone wood floor

Scope

What the work can include

Every project is scoped individually. This is what is typically part of the work, not a package.

  • Hardwood, engineered wood, luxury vinyl plank and tile installation
  • Sanding and refinishing existing hardwood where the boards allow it
  • Subfloor repair, new underlayment and leveling to the product's flatness rule
  • Removal of old floor layers once older materials have been identified
  • Thresholds, reducers and stair nosings planned room by room
  • Baseboard and shoe molding reset after the new floor is down

New York homes

What is different here

  1. Several floors stacked in one room

    Older New York houses often hide two or three floors in the same room: sheet vinyl over tile, carpet over strip oak, extra plywood under a kitchen. Each layer that stays raises the finished height, and the count is rarely known until a threshold or register is lifted. We open an inconspicuous edge during the site visit, record what we find, and decide with you which layers come out before the product is chosen.

  2. Upper floors over another household

    In a two-family house or an apartment, a hard floor above someone else's ceiling carries footfall noise. Many apartment buildings, co-op boards and condominium associations set their own rules on underlayment, coverage and work hours in an alteration agreement. We ask for those building rules at the start and build them into the product choice and the schedule, rather than discovering them when the managing agent reviews the job.

  3. Basements and slabs below grade

    A below-grade concrete slab is a different substrate from a wood subfloor upstairs. Solid hardwood rarely suits a below-grade room, so basement rooms usually get tile or a vinyl product rated for that use, installed only over a slab that has been confirmed dry. Where a basement already has old resilient tile glued to the concrete, we treat it as a material to identify before any grinding or covering decision.

Choosing the approach

Refinish, overlay or replace

How we decide what happens to an existing floor
SituationUsual directionWhat we check first
Solid hardwood with worn finish, boards soundSand and refinishRemaining board thickness, old nail or staple repairs, pre-1978 finishes
Old resilient tile or sheet flooringCover or remove after identificationLab result for the tile, backing and adhesive
Soft, bouncing or sagging areasPause the flooring decisionWhether the problem is in the subfloor or in the framing below
Concrete slab in a basementTile or below-grade-rated vinylDryness of the slab and any history of water

If joists, beams or other floor framing are sagging or damaged, that is structural work outside our flooring service. When a soft spot turns out to be framing, we stop and recommend an engineer before any finish goes down.

In New York City, DOB treats floor resurfacing as work that needs no permit, though whoever does it still needs a DCWP home improvement license. For the room-to-room height question, see planning floor transitions across several rooms.

Installation planning

Details we settle before installation day

  • Expansion gap: floating floors need room to move at walls. One manufacturer specifies at least 3/8 inch and says transition moldings must not pinch the flooring or be fastened through it.
  • Cabinets and appliances: whether the floor runs under the cabinets or stops at them changes dishwasher clearance and the kitchen sequence.
  • Painted trim in older homes: removing baseboard and undercutting jambs disturbs painted surfaces, so EPA lead-safe rules apply to that step in homes built before 1978.
  • Room order: where tile meets wood, we settle the installation sequence and which trade sets the transition strip.

Process

How a project runs

Written scope, written proposal, permits identified up front, and one project lead from start to finish.

  1. Conversation

    You describe the home and what you want to change. We ask about budget range and timing so expectations are clear early.

  2. Site visit and scope

    We look at the space, the structure of the house and any HOA, co-op or condo rules that apply, then write a scope of work.

  3. Design and selections

    Layout, materials and fixtures are agreed in writing before work is priced in full.

  4. Written proposal

    A written price and schedule for the agreed scope. Permits and any approvals are identified at this stage.

  5. Build

    One project lead coordinates the trades and keeps you updated. Some regulated work may require appropriately licensed specialty contractors.

  6. Walkthrough

    We review the finished work with you and resolve anything outstanding.

Design inspiration

Styles and materials to talk through

Hand holding a fan of paint colour swatches over plans and an open notebook
Bright living room in an older house with tall windows, a white mantel fireplace, a curved sofa and a jute rug
Living room in a detached house with a bay window, brick fireplace and wood floors

Questions

Common questions

Do you remove old vinyl or linoleum before installing a new floor?
Not until it has been identified. EPA's guidance is that asbestos usually can't be spotted by eye unless the product is labeled, and it warns against sanding or leveling asbestos flooring or the backing under it. One vinyl manufacturer tells installers to presume old resilient flooring contains it unless they are certain otherwise. We arrange sampling first, then decide whether to cover, remove or hand the material to an abatement professional.
Will a new floor stop my doors from closing?
It can, which is why we plan heights before ordering. Interior doors are usually trimmed and wood door jambs undercut so the new floor slides beneath them; a vinyl maker's instructions call for undercutting wood jambs every time and checking local code before touching metal ones. Entry doors and doors between units in a two-family house get a closer look before anything is cut.
How flat does the subfloor need to be?
Each product sets its own rule. One luxury vinyl maker, for example, allows no more than 3/16 inch of variation across 10 feet (or 1/8 inch across 6 feet), and permits laying its product over an old floor only when that floor is clean, flat, dry and firmly bonded. We measure against the instructions for the product you pick and price the leveling that brings the room into range.
Can new flooring go straight over an old floor?
Sometimes. It depends on the new product's instructions, how flat and well bonded the old floor is, what it is made of and how much height the room can take at its doorways. We check all four and put the answer, with the reason, in the written scope.
Which floors suit an apartment with a downstairs neighbor?
Start with the building's alteration rules, which may require a specific underlayment or a share of the floor covered by rugs. Within those rules, we compare products by how they handle footfall, how they meet the existing door heights and how quietly they can be installed during permitted hours.

Service areas

Where we work

MMA Construction & Remodeling works in Queens, Brooklyn, the Bronx, Manhattan, Staten Island and Suffolk County.

Ready to talk about your project?

Call or email us to talk it through and arrange a consultation.