MMA ConstructionConstruction & Remodeling Call MMA Construction

Service area

Brooklyn Home Remodeling Contractor

MMA Construction & Remodeling plans and runs interior remodels in Brooklyn: kitchens, bathrooms, basements, whole-home renovations, flooring, drywall and painting. Nearly half of the borough's housing predates 1940, and much of it is attached houses and two- to four-unit buildings, so our scopes account for old walls, shared utilities and landmark status from the first visit.

  • Attached rowhouses and two- to four-unit buildings, many pre-1940
  • Written scopes that allow for what older walls and floors reveal
  • Landmark map search for the address before design work starts

Process

How we run projects in Brooklyn

Written scope, written proposal, permits identified up front, and one project lead from start to finish.

  1. Conversation

    You describe the home and what you want to change. We ask about budget range and timing so expectations are clear early.

  2. Site visit and scope

    We look at the space, the structure of the house and any HOA, co-op or condo rules that apply, then write a scope of work.

  3. Design and selections

    Layout, materials and fixtures are agreed in writing before work is priced in full.

  4. Written proposal

    A written price and schedule for the agreed scope. Permits and any approvals are identified at this stage.

  5. Build

    One project lead coordinates the trades and keeps you updated. Some regulated work may require appropriately licensed specialty contractors.

  6. Walkthrough

    We review the finished work with you and resolve anything outstanding.

Brooklyn

What shapes a remodel here

  1. Old structures and what opens up

    With 48.4% of Brooklyn units in buildings from 1939 or earlier, many projects begin in a structure far older than its systems. Plaster walls, aging wiring and out-of-level floors are common, so our written scope separates the work we can define now from allowances for conditions found once walls are open. The city requires a DEP-certified investigator to survey for asbestos before work that could disturb suspect materials, and paid work that disturbs paint in pre-1978 housing follows EPA lead-safe rules. Those steps go on the schedule at the start rather than surfacing mid-job.

  2. Narrow attached houses and shared walls

    Attached single-family houses outnumber detached ones in Brooklyn by almost two to one, and a narrow rowhouse brings practical limits. Materials and debris share one entrance, the stair sets the size of what can be carried in, and party walls are shared with the neighbors. Those walls often decide where new plumbing can run, and any work on or through a shared wall goes to a qualified professional before it enters the scope. Our project lead plans deliveries, debris removal and communication with neighbors around those constraints.

  3. Small multi-unit buildings and landmark blocks

    About 32% of Brooklyn units are in buildings with two to four units, so work in one apartment can interrupt water, heat or power for the others, and shutoffs are planned unit by unit. The borough also has dozens of LPC historic districts, from Brooklyn Heights and Park Slope to Ditmas Park and Sunset Park, and a district can be as small as a single block. A designated address needs an LPC permit before DOB can act on the DOB application, so the landmark map search comes before any layout is drawn.

Local evidence

Housing, permits and local rules in Brooklyn

Research notes with sources, for planning. Not a permit determination for any property.

What the housing stock looks like

Brooklyn housing units by type and age (ACS 2024 1-year estimates)
MeasureShare of housing units
Single-family attached8.2%
Single-family detached4.5%
Two-unit buildings15.2%
Three- and four-unit buildings16.5%
Buildings with 50+ units25.0%
Built 1939 or earlier48.4%

Attached houses outnumber detached ones, and small buildings with two to four units hold about 32% of units. With 48.4% of units in pre-1940 buildings, many Brooklyn remodels start in very old structures.

What that means for a remodel

  • Old walls and floors: plaster walls, old wiring and uneven floors are common in older buildings, so the scope should allow for conditions found during demolition. See renovating an older Brooklyn house.
  • Lead and asbestos: For paid work that disturbs paint in housing built before 1978, EPA lead-safe rules apply. NYC Local Law 1 of 2004 also requires owners of rental units in buildings built before 1960 to presume lead-based paint is present. Before work that could disturb suspect materials, NYC requires an asbestos survey by a DEP-certified investigator.
  • Narrow attached houses: shared walls and tight access affect material delivery, debris removal and where new plumbing can run.
  • Owner-occupied two- to four-unit buildings: work on one unit can affect the others' water, heat and power, so shutoffs need planning.

Permits and licensing

Brooklyn is one of the five boroughs, so building permits come from the NYC Department of Buildings, not a local office. DOB lists painting, new cabinets and floor resurfacing as examples of work that doesn't need a permit; more complex kitchen and bathroom work may need plans filed by a licensed engineer or architect. Contractors doing home improvement work in the city need a license from the NYC Department of Consumer and Worker Protection.

See renovation permits in NYC vs Suffolk.

Neighborhood names and landmark status

A Brooklyn neighborhood name does not change who issues building permits: that is the NYC Department of Buildings everywhere in the borough. What does change from one block to the next is landmark designation. The Landmarks Preservation Commission says to search the address on its Discover NYC Landmarks map. If a property is designated, an LPC application and permit are needed before the Department of Buildings can act on the DOB application.

For interior work in a designated building, LPC's permit page says an LPC permit is required when the work needs a DOB permit, when it affects the exterior (for example HVAC louvers and vents), or when it affects a designated interior. Exterior work needs an LPC permit even without a DOB permit.

LPC's historic-district dataset (accessed 2026-11-08) lists these Brooklyn historic districts: Albemarle-Kenmore Terraces, Alice and Agate Courts, Bay Ridge Parkway-Doctors' Row, Bedford, Beverley Square West, Boerum Hill, Borough Hall Skyscraper, Brooklyn Academy of Music, Brooklyn Heights, Carroll Gardens, Central Sunset Park, Chester Court, Clinton Hill, Cobble Hill (and its extension), Crown Heights North (I, II and III), Ditmas Park, Ditmas Park West, DUMBO, East 25th Street, Eberhard Faber Pencil Company, Fillmore Place, Fiske Terrace-Midwood Park, Fort Greene, Fulton Ferry, Greenpoint, Linden Street, Melrose Parkside, Ocean on the Park, Park Place, Park Slope, Prospect Heights, Prospect Lefferts Gardens, Prospect Park South, Stuyvesant Heights, Sunset Park 50th Street, Sunset Park North, Sunset Park South, Wallabout and Willoughby-Hart. A district can be a single block, so the address search, not the neighborhood name, is what decides.

Flood zones

Look up the address on FEMA's Flood Map Service Center, the official public source for FEMA flood hazard information, and see the city's NYC Flood Maps page for how FEMA's maps apply in New York City. Waterfront and low-lying neighborhoods include mapped flood hazard areas. Flood exposure affects whether a basement is worth finishing and which materials make sense.

Neighborhood snapshots at NTA level

Borough figures above describe Brooklyn as a whole. For the neighborhoods researched for this plan, the city's PLUTO tax-lot file gives a closer view. The figures are for DCP's neighborhood tabulation areas (NTAs). An NTA is a group of census tracts that approximates a neighborhood. Its name and edges are not official boundaries.

Tax lots with at least one residential unit, PLUTO 26v2 aggregated to 2020 NTAs (accessed 2026-11-08)
NTA (DCP code)Lots with homesOne- or two-family share of those lotsShare of homes on elevator-building lotsLots flagged on FEMA 2015 preliminary mapLots in an LPC historic district
Bay Ridge (BK1001)9,67471.7%35.4%052 (0.5%)
Dyker Heights (BK1002)6,52272.2%2.8%00
Marine Park-Mill Basin-Bergen Beach (BK1802)10,80592.0%0.8%2,572 (23.8%)0
Park Slope (BK0602)6,46443.3%13.1%02,548 (39.4%)
Flatbush (BK1401)2,43751.4%64.7%052 (2.1%)
Flatbush (West)-Ditmas Park-Parkville (BK1402)3,03271.1%46.6%0850 (28.0%)
Sheepshead Bay-Manhattan Beach-Gerritsen Beach (BK1503)8,66286.9%41.4%5,761 (66.5%)0

In Dyker Heights, about 72% of lots with homes are one- or two-family houses, and walk-up buildings hold about 35% of the area's homes. No lot is flagged on either FEMA map, and none is in an LPC historic district. The general Brooklyn guidance on this page applies there, including the brief below. In the Marine Park NTA, by contrast, the 2015 preliminary flood map flags far more lots than the 2007 map (2,572 against 398). A flag means only that part of a lot touches the mapped floodplain, so check the exact address.

Manhattan Beach is covered here. DCP's statistical area for it also contains Sheepshead Bay and Gerritsen Beach. In that area, 66.5% of lots with homes are flagged on FEMA's 2015 preliminary map, against 16.6% on the 2007 map, and no lot is in an LPC historic district. Those figures describe the whole area, not Manhattan Beach alone. A flag means only that part of a lot touches the mapped floodplain, so check the exact address on both maps. The Gerritsen Beach blocks are also mapped in a special coastal zoning district, which has its own page.

What to write down before pricing work in a Brooklyn house

Brooklyn neighborhoods mix attached row houses, semi-detached and detached houses and apartment buildings, so two homes on the same block can need very different briefs. For the exact property, note:

  1. Whether the house is attached, semi-detached or detached, and which walls it shares with a neighbor. Ask a qualified professional before planning any work on or through a shared wall.
  2. Whether any floor is used as an office or store, and what the Certificate of Occupancy, if there is one, says about each floor, including the cellar.
  3. The result of an LPC Discover NYC Landmarks map search for the address, read together with the landmark section above.
  4. The address's status on FEMA's 2007 effective flood map and its 2015 preliminary map, if work is planned at cellar or ground level.
  5. Which rooms the household, or the occupant of a second unit, needs during the work, especially when remodeling the only bathroom in a Brooklyn house.
  6. Changes to the outside of the house, such as vents, windows, doors, the stoop or the areaway, listed separately from interior finishes.
These are planning prompts, not a permit checklist. Which filings apply to a property is a question for DOB, LPC where relevant, and a qualified professional.

Neighborhood pages and what this page covers

Separate pages exist for Bay Ridge, covering house versus apartment-building projects and the Doctors' Row historic district; Marine Park, covering flood maps and basement planning; Flatbush, covering its six historic districts of free-standing houses; Park Slope, covering its three historic-district designations and why a building's unit count matters; Brooklyn Heights, covering the city's first historic district and its co-op buildings; and Gerritsen Beach, covering its special coastal zoning and flood rules. Dyker Heights is covered here. It shares a community district with Bay Ridge, has the same permit authority, has no lots with homes in an LPC historic district or on either flood map, and its checks are the same as Bay Ridge's.

Before you hire

Before you hire in Brooklyn

Whoever you hire, check these before you sign. They apply to us too.

  • License and complaints: New York City requires a DCWP Home Improvement Contractor license for work costing more than $200 on a residential building. Check it by calling 311 or with DCWP's license check, and ask 311 for a "Business Background Check".
  • Written scope and contract: signed by both of you, with a copy before work starts. It should list what is included and excluded, each allowance in dollars, how changes are priced and approved, and who files which permits. DCWP advises paying no more than 25% upfront, never in cash.
  • Insurance: ask for the contractor's certificate of insurance.
  • Landmarked houses: if the address is in an LPC historic district, ask who prepares and files the LPC application, and whether its timing is in the schedule.

Permits

Who issues building permits

Permits for the five boroughs are issued by NYC DOB. Listed plumbing work requires a Licensed Master Plumber, and contractors need a NYC DCWP home improvement license.

NYC Department of Buildings

Talk through your remodel in Brooklyn

Call or email us to talk it through and arrange a consultation.

Questions

Remodeling in Brooklyn: questions

What does a general contractor coordinate on a Brooklyn remodel?
In plain terms, a general contractor runs the project and coordinates the trades. On a project with us that means one project lead who schedules the plumber, electrician, tile, flooring and painting crews and keeps the written scope current. Some regulated work, such as listed plumbing, may require appropriately licensed specialty contractors. Permits are identified and filed where the scope requires them. Structural work, additions and exterior work are outside our scope.
My Brooklyn block is in a historic district. What changes for interior work?
Designation adds an approval step. Under LPC's permit guidance, interior work needs LPC sign-off if it requires a DOB permit, if it changes the outside, as new vents or louvers do, or if it touches a designated interior. We search the address on LPC's Discover NYC Landmarks map and build that approval into the timeline. The Park Slope and Flatbush pages cover two heavily designated parts of the borough.
Can a Brooklyn rowhouse be renovated one floor at a time?
Yes, and many owners prefer it when the household or a tenant stays in the building. A phased job keeps some floors livable but opens the stair, the risers and the shutoffs more than once; a single sequence suits an empty house. We decide early which systems should be opened once for the whole house, then set the phases around that. The whole-home renovation in Brooklyn page goes deeper on sequencing.

Sources

  1. B25024 Units in Structure, Kings County (Brooklyn), ACS 2024 1-year estimates, U.S. Census Bureau via Census Reporter (2025 (ACS 2024 1-year release)). Accessed 2026-11-02.
  2. B25034 Year Structure Built, Kings County (Brooklyn), ACS 2024 1-year estimates, U.S. Census Bureau via Census Reporter (2025 (ACS 2024 1-year release)). Accessed 2026-11-02.
  3. Renovating Kitchens & Bathrooms, NYC Department of Buildings. Accessed 2026-11-02.
  4. Do I Need a Permit?, NYC Department of Buildings. Accessed 2026-11-02.
  5. License Checklist: Home Improvement Contractor, NYC Department of Consumer and Worker Protection. Accessed 2026-11-02.
  6. NYC Flood Hazard Mapper, NYC Department of City Planning. Accessed 2026-11-02.
  7. FEMA Flood Map Service Center, Federal Emergency Management Agency. Accessed 2026-11-02.
  8. NYC Flood Maps, City of New York. Accessed 2026-11-02.
  9. Lead Renovation, Repair and Painting Program Rules, U.S. Environmental Protection Agency. Accessed 2026-11-02.
  10. Lead-Based Paint, NYC Department of Housing Preservation and Development. Accessed 2026-11-02.
  11. Asbestos Abatement, NYC Department of Environmental Protection. Accessed 2026-11-02.
  12. Landmark Status Letter, NYC Landmarks Preservation Commission. Accessed 2026-11-08.
  13. Permit Types, NYC Landmarks Preservation Commission. Accessed 2026-11-08.
  14. Historic Districts (dataset skyk-mpzq), NYC Landmarks Preservation Commission via NYC Open Data (rows updated 2026-06-18). Accessed 2026-11-08.
  15. Primary Land Use Tax Lot Output (PLUTO), version 26v2 (dataset 64uk-42ks), NYC Department of City Planning via NYC Open Data (26v2 (rows updated 2026-08-24)). Accessed 2026-11-08.
  16. PLUTO Data Dictionary (23v1.1), NYC Department of City Planning (2023-05). Accessed 2026-11-08.
  17. 2020 Census Tracts to 2020 NTAs and CDTAs Equivalency (dataset hm78-6dwm), NYC Department of City Planning via NYC Open Data (2021-09-20). Accessed 2026-11-08.
  18. The Newest New Yorkers 2026, Chapter 1, NYC Department of City Planning (2026). Accessed 2026-11-08.
  19. Zoning Resolution Article XIII Chapter 7: Special Coastal Risk District, NYC Department of City Planning (chapter last amended 2021-05-12; sections to 2024-12-05). Accessed 2026-11-08.
  20. Hiring a Home Improvement Contractor, NYC Department of Consumer and Worker Protection. Accessed 2026-11-09.
  21. Check License Status, NYC Department of Consumer and Worker Protection. Accessed 2026-11-09.
  22. Q&A: Alterations in a Co-op, The Cooperator (cooperatornews.com). Accessed 2026-11-13.

Planning a remodel in Brooklyn?

Call or email us to talk it through and arrange a consultation.