MMA ConstructionConstruction & Remodeling Call MMA Construction

Brooklyn · local planning notes

Remodeling a house in Flatbush, Brooklyn

Six Landmarks Preservation Commission historic districts sit in the Flatbush statistical areas, designated between 1978 and 2025. Two of them date only from November 2025. For a kitchen or bathroom in a free-standing house here, first find out whether the address is in one, then read what the district's report records about the house.

Part of our Brooklyn service area. Confirm the building authority for your exact address.

What this page covers

This page is for owners of single-family and two-family houses in Flatbush, especially the free-standing frame houses of the historic districts, who are planning kitchen, bathroom or whole-interior work. Flatbush is a Brooklyn neighborhood, so building permits come from the NYC Department of Buildings (DOB). The figures below are for two DCP neighborhood tabulation areas (NTAs): Flatbush (BK1401) and Flatbush (West)-Ditmas Park-Parkville (BK1402). NTAs are statistical areas built from census tracts. Their names and edges are not official neighborhood boundaries, and East Flatbush and Midwood are separate NTAs not covered here. Structural alterations, additions and new construction are not planned services. Availability and service-area approval have not been established.

LPC designations

Six districts with different dates

LPC historic districts with lots in the two Flatbush NTAs (LPC Historic Districts dataset and designation reports; PLUTO 26v2 lot counts; accessed 2026-11-08)
District (LPC number)DesignatedWhat the LPC report describesLots with homes (PLUTO)
Albemarle-Kenmore Terraces (LP-0989)July 11, 1978Report not opened for this page. In PLUTO most lots are attached or semi-detached one-family houses.32
Prospect Park South (LP-0979)February 8, 1979Dean Alvord's suburban development on about fifty acres bought in 1899. Most early houses are freestanding, frame, two stories with attics, in clapboard or shingle; some stucco or brick.202
Ditmas Park (LP-1236)July 28, 1981Development begun in 1902 by Lewis H. Pounds. Most houses are freestanding, frame, two stories with attics, in clapboard or shingle; a few brick; some bungalows.171
Fiske Terrace-Midwood Park (LP-2208)March 18, 2008Report not opened for this page. PLUTO places all of its lots with homes in the BK1402 NTA, despite the Midwood name.252
Beverley Square West (LP-2692)November 25, 2025118 free-standing houses, most built 1894-1906, between Beverley and Cortelyou roads. Nearly all lots 50 feet wide; most houses two and a half stories with full-width front porches and angled bays.118
Ditmas Park West (LP-2693)November 25, 2025127 free-standing houses, most built 1902-1906, between Dorchester Road and Ditmas Avenue. Lots 40 to 60 feet wide; about half designed by Arlington D. Isham.127

The Brooklyn page lists every Brooklyn district and explains which interior work LPC says it reviews. What matters here is that these six districts cover specific blocks, were designated decades apart, and are described in separate reports. A house on the next block can be outside all of them.

If you bought or planned work on a house in Beverley Square West or Ditmas Park West before November 25, 2025, check the address again. Designation is recent there, and plans drawn earlier may not have considered LPC review. Whether a given item now needs an LPC permit is a question for LPC.

What the lot data shows

How much of the area is designated

Tax lots with at least one residential unit, PLUTO 26v2 aggregated to 2020 NTAs (accessed 2026-11-08)
NTA (DCP code)Lots with homesOne- or two-family share of lotsShare of homes on elevator-building lotsLots in an LPC historic district
Flatbush (West)-Ditmas Park-Parkville (BK1402)3,03271.1%46.6%850 (28.0%)
Flatbush (BK1401)2,43751.4%64.7%52 (2.1%)

In BK1402, 35% of lots with homes are class A1, two-story detached one-family houses, and inside each of its five districts at least 94% of lots with homes are one- or two-family houses. Yet nearly half of the NTA's homes are on elevator-building lots. In BK1401, elevator buildings hold about two-thirds of homes. So the same street name can mean a free-standing frame house or a large apartment building, and the two need different briefs. More than 90% of lots with homes in both NTAs record a year built before 1940; DCP says the field is accurate to the decade, not the year.

No lot with homes in either NTA is flagged on FEMA's 2007 or 2015 flood maps in PLUTO. That is an area reading, not an address check.

What a designation report can tell you about your house

Each district's LPC designation report describes the district as a whole and then the buildings in it. The 2025 Ditmas Park West and Beverley Square West reports have a building-profiles section. The 1979 Prospect Park South and 1981 Ditmas Park reports describe houses entry by entry, with siding, porch, bay and window details. For an interior project, that entry is a quick record of what LPC described on the outside of your house when the district was designated.

Both older reports also note that many houses had already lost original siding to artificial shingles or aluminum, had porches enclosed or had details removed. So the house you see today may not match the report, and the report may not match what lies under later siding. A kitchen or bath plan in these houses often touches the outside: a range-hood or bath-fan duct through a clapboard wall, a replaced or enlarged window, a new side door. List those items separately and ask LPC and your design professional how they would be reviewed. See the kitchen ventilation guide and renovating an older home.

These are planning prompts, not landmark determinations. Whether an item needs an LPC permit, and which kind, is decided by LPC.

Address worksheet before asking for proposals

  1. Search the exact address on LPC's Discover NYC Landmarks map and note the district name, if any.
  2. If it is designated, find the district's designation report and the entry or profile for your house. Save it with the brief.
  3. Note whether the house is free-standing, semi-detached or attached, and whether it is one- or two-family on the Certificate of Occupancy, if there is one.
  4. List every item that changes the outside: duct and vent exits, windows, doors, porch work, exterior lights, condenser locations.
  5. Note plumbing that moves. Moved fixtures usually raise DOB filing questions, and in a designated house they can also raise LPC questions.
  6. Mark which rooms the household needs during the work. See the living at home guide.

Room scope examples are on kitchen remodeling and bathroom remodeling. For another Brooklyn district page, see Bay Ridge, which covers a single row-house district.

Permits

Who issues building permits

Every Flatbush address is in Brooklyn, so building permits come from NYC DOB. For a property in one of the LPC historic districts, LPC says its permit is needed before DOB can act. This page is not a permit or landmark determination.

NYC Department of Buildings

Sources

  1. Do I Need a Permit?, NYC Department of Buildings. Accessed 2026-11-08.
  2. Landmark Status Letter, NYC Landmarks Preservation Commission. Accessed 2026-11-08.
  3. Permit Types, NYC Landmarks Preservation Commission. Accessed 2026-11-08.
  4. Historic Districts (dataset skyk-mpzq), NYC Landmarks Preservation Commission via NYC Open Data (rows updated 2026-06-18). Accessed 2026-11-08.
  5. Prospect Park South Historic District Designation Report (LP-0979), NYC Landmarks Preservation Commission (1979-02-08). Accessed 2026-11-08.
  6. Ditmas Park Historic District Designation Report (LP-1236), NYC Landmarks Preservation Commission (1981-07-28). Accessed 2026-11-08.
  7. Ditmas Park West Historic District Designation Report (LP-2693), NYC Landmarks Preservation Commission (2025-11-25). Accessed 2026-11-08.
  8. Beverley Square West Historic District Designation Report (LP-2692), NYC Landmarks Preservation Commission (2025-11-25). Accessed 2026-11-08.
  9. LPC Designates Two New Historic Districts in Flatbush, NYC Landmarks Preservation Commission (2025-11-25). Accessed 2026-11-08.
  10. Primary Land Use Tax Lot Output (PLUTO), version 26v2 (dataset 64uk-42ks), NYC Department of City Planning via NYC Open Data (26v2 (rows updated 2026-08-24)). Accessed 2026-11-08.
  11. PLUTO Data Dictionary (23v1.1), NYC Department of City Planning (2023-05). Accessed 2026-11-08.
  12. 2020 Census Tracts to 2020 NTAs and CDTAs Equivalency (dataset hm78-6dwm), NYC Department of City Planning via NYC Open Data (2021-09-20). Accessed 2026-11-08.
  13. The Newest New Yorkers 2026, Chapter 1, NYC Department of City Planning (2026). Accessed 2026-11-08.

Questions

Common questions

Is all of Flatbush landmarked?
No. Six LPC districts cover specific blocks in the two Flatbush NTAs. In the western NTA about 28% of lots with homes are in one; in the eastern NTA about 2%. Search the exact address.
My house is in Ditmas Park West. Is that new?
Yes. LPC designated Ditmas Park West and Beverley Square West on November 25, 2025. Check the address and ask LPC how the designation affects your plan.
Where can I see what LPC recorded about my house?
In the district's designation report, which describes houses one by one. Find the entry for your address.
Are Flatbush projects being accepted?
Not through this preview. Coverage, credentials and launch approval are still pending.

General planning information, not a permit determination for any property. Back to Brooklyn.

Ready to talk about your project?

Call or email us to talk it through and arrange a consultation.