MMA ConstructionConstruction & Remodeling Call MMA Construction

Planning guide

Kitchen ventilation: the questions to settle before choosing a hood

A range hood is a mechanical system, not just an appliance. Where its air goes, and what replaces that air, are design decisions with code rules behind them.

Updated 2026-11-08 · General information, not legal or engineering advice.

Short answer

Decide early whether the hood will exhaust outdoors and how the duct can reach outside, because that shapes the layout. EPA says a stove hood vented outdoors greatly reduces exposure to cooking pollutants. Larger hoods can raise makeup-air requirements, and the rules differ between New York City and the rest of the state, so the design professional confirms them.

Who it is for
Owners of single-family and two-family houses planning a kitchen remodel with a new or relocated range, cooktop or hood
What it covers
Ventilation decisions to raise with the designer and licensed trades; not an installation or sizing method
When to read it
During layout planning, before the hood, cooking appliance and cabinets are ordered

Why ventilation is a layout decision

Cooking produces moisture, grease, odors and fine particles, and gas burners add combustion products. EPA's indoor air guidance says that using a stove hood with a fan vented to the outdoors greatly reduces exposure to pollutants during cooking. It recommends turning the hood on whenever you cook, leaving it on for 10 to 20 minutes afterward and cooking on the back burners when possible.

Those habits only help if the hood can do its job, and that depends on where the cooktop sits. A range on an outside wall is usually simpler to vent than one in an island or in the middle of a two-family house's interior. Settle the ventilation question while the layout is still flexible, alongside kitchen layout and storage planning.

Ducted or ductless: what the codes say in broad terms

In New York City, the NYC Mechanical Code addresses domestic range hoods, ductless hoods and makeup air (Sections 505.1 and 505.2); ask the design professional how it applies to your kitchen.

In Suffolk County and the rest of the state, residential work falls under the New York State Uniform Code. The Department of State's notice says the 2025 Uniform Code, including the 2025 Residential Code of New York State, took effect on December 31, 2025, with a transition period in which applicants could choose between the 2025 and 2020 editions. This guide did not quote that code's kitchen-exhaust provisions; your town or village building department and the design professional apply them.

These are summaries for planning conversations, not code determinations. Which edition applies, whether a ductless hood is allowed in your kitchen and whether makeup air is required are confirmed by the design professional and the local building authority.

Makeup air and gas appliances

Every cubic foot of air a hood pulls out has to be replaced from somewhere. In a tight house, a powerful exhaust fan can make it harder for other appliances that rely on natural draft to vent properly. EPA notes that pollutants from fireplaces and woodstoves with no dedicated outdoor air supply can be back-drafted into the living space, particularly in weatherized homes.

  • Ask whether the hood you like triggers a makeup-air requirement under the code that applies to your house.
  • List every fuel-burning appliance in the house, including the boiler or furnace, water heater, fireplace and dryer, and ask how the hood affects them.
  • If makeup air is required, ask how it will be provided and controlled, and include it in the scope and the estimate.
  • Keep gas burners properly adjusted. EPA notes a persistently yellow-tipped flame suggests improper adjustment and advises asking the gas company to adjust it; this is not a household task.

Questions to settle before you order a hood

  1. Will the hood exhaust outdoors, and what route can the duct take to an outside wall or roof?
  2. In a two-family house, does that route pass through the other unit or a shared space?
  3. Does the planned hood or cooking appliance raise a makeup-air question under the code that applies to your house?
  4. Which fuel-burning appliances share the house, and has their venting been considered?
  5. Who designs the system and who installs it? Ductwork, wall or roof penetrations, wiring and any gas work belong to the appropriate licensed trades.
  6. Does the estimate list the hood, duct, exterior termination, makeup air (if any) and any patching and finishing separately?

Line those items up when you compare remodeling estimates, so one proposal's hood isn't priced without the duct and another's with it.

Planning aid

Kitchen ventilation pre-check

  • Cooktop or range location chosen with a possible duct route to the outside in mind
  • Ducted or ductless decision confirmed with the design professional for the code that applies
  • Makeup-air question asked and answered in writing
  • Fuel-burning appliances in the house listed for the designer
  • Hood, duct, termination and any makeup air itemized in each estimate
  • Which licensed trade handles ductwork, penetrations, wiring and any gas work
  • Household habit: run the hood while cooking and for 10 to 20 minutes after, per EPA

Sources

  1. 2022 NYC Mechanical Code, Chapter 5: Exhaust Systems, NYC Department of Buildings (2022 code edition). Accessed 2026-11-08.
  2. 2022 Construction Codes, NYC Department of Buildings. Accessed 2026-11-08.
  3. Notice of Adoption, New York State Department of State (undated (latest item dated 2026-10-07)). Accessed 2026-11-08.
  4. Strategies for Improving Indoor Air Quality While Cooking (infographic), U.S. Environmental Protection Agency (2026-03-10). Accessed 2026-11-08.
  5. Sources of Combustion Products, U.S. Environmental Protection Agency (2025-12-17). Accessed 2026-11-08.

Planning a new range or hood location?

Share the kitchen layout and the appliances you're considering. In the planned process, ventilation is settled with the design professional before the scope is priced.