MMA ConstructionConstruction & Remodeling Call MMA Construction

Kitchen remodeling · The Bronx

Bronx kitchen remodeling for apartments and houses

MMA Construction & Remodeling provides kitchen remodeling in the Bronx for two very different homes: apartments in large co-op and condo buildings, and one- and two-family houses in areas such as Throggs Neck and Pelham Bay. We work to the building's alteration rules or the house's own systems; regulated gas, plumbing and electrical changes can need appropriately licensed specialty contractors.

  • Co-op and condo kitchens planned around the alteration agreement
  • Wet-wall and riser limits checked before the layout is drawn
  • East Bronx houses: gas, power and older pipes planned into the scope
Traditional white kitchen with inset cabinetry, a marble backsplash, a wood-clad hood and crystal pendants

Scope

Bronx kitchen remodeling scope

About 61% of Bronx units are in buildings with 20 or more units, so many Bronx kitchens are apartment kitchens. The scope separates what the building controls from what you choose.

  • An alteration package for the board: scope, layout drawing, trades and schedule
  • Cabinet and counter replacement that keeps the existing plumbing and gas locations
  • Appliance upgrades with electrical capacity checked first
  • A recirculating or ducted hood, depending on what the building allows
  • Work hours, elevator protection and debris removal under building rules
  • In houses: layout changes, new gas or water runs and DOB filings where required
  • New floor, patched walls, lighting and paint so the kitchen is finished, not just installed

Process

How MMA Construction & Remodeling runs a kitchen remodeling project

Written scope, written proposal, permits identified up front, and one project lead from start to finish.

  1. Conversation

    You describe the home and what you want to change. We ask about budget range and timing so expectations are clear early.

  2. Site visit and scope

    We look at the space, the structure of the house and any HOA, co-op or condo rules that apply, then write a scope of work.

  3. Design and selections

    Layout, materials and fixtures are agreed in writing before work is priced in full.

  4. Written proposal

    A written price and schedule for the agreed scope. Permits and any approvals are identified at this stage.

  5. Build

    One project lead coordinates the trades and keeps you updated. Some regulated work may require appropriately licensed specialty contractors.

  6. Walkthrough

    We review the finished work with you and resolve anything outstanding.

The Bronx

Bronx kitchen decisions that come before design

  1. In a co-op, the alteration agreement sets the rules

    For an apartment kitchen, the building's alteration agreement usually decides working hours, the certificates the building requires and which approvals come first. Many boards also restrict moving a sink or range away from the existing risers, because new drain and gas runs cross floors and ceilings the building controls. We read the agreement with you before the layout is fixed, so the plan you settle on is one the board can approve. Board review time goes into the schedule as its own line.

  2. Apartment kitchens rarely have a path to an outside wall

    In a large building, the kitchen is often an interior room or sits on a shaft rather than a facade. A ducted hood needs a route outdoors that the building permits, and some buildings allow no new penetrations at all. Where that is the case, the realistic choice is usually a recirculating hood with good filters, alongside the building's own ventilation. Which option is allowed in your apartment is a question for the building and, where needed, a design professional.

  3. Houses in the east Bronx are a different job

    Borough-wide, about one in five Bronx units is in a one- or two-family building, but in Throgs Neck-Schuylerville the share is about 69%, and in the Pelham Bay-Country Club-City Island area about 53%. Those homes are mostly older: roughly 80% of Throgs Neck-Schuylerville units predate 1980. A house kitchen there can move fixtures, add circuits or change cooking fuel; that plumbing and electrical work may require appropriately licensed specialty contractors, and NYC DOB receives any permit filing it requires.

  4. Cooperative land and older island houses

    Some Throggs Neck houses stand on cooperative land: a 2015 City Planning study describes Edgewater Park as a community where residents own their homes but lease the land from an owners' collective. In a community like that, we ask for its construction rules early, alongside the DOB question. On City Island, most housing units date from 1939 or earlier and about a third of lots with homes touch FEMA's 2015 preliminary floodplain, so a low first-floor kitchen is planned with the flood lookup done.

Apartment or house: tell us which

Send the alteration agreement if you have one, or the address and a few photos of a house kitchen. We plan the site visit around the rules that apply.

Local evidence

Bronx housing mix and permit facts for kitchen work

Selected Bronx NTAs: share of housing units (ACS 2020-2024 5-year estimates, summed over each NTA's census tracts)
NTAOne- or two-family buildingsBuildings with 50+ unitsBuilt before 1980
Riverdale-Spuyten Duyvil15.0%60.2%90.9%
Throgs Neck-Schuylerville68.9%5.1%80.5%
Pelham Bay-Country Club-City Island53.1%16.8%85.7%

Borough-wide, 32.5% of units were built in 1939 or earlier and about 76.2% before 1980. Where a kitchen tear-out disturbs paint in a pre-1978 home, EPA lead-safe rules govern how the work is done. A Bronx owner who rents out a unit in a pre-1960 building must also presume lead paint in it under the city's Local Law 1 of 2004.

Permits for every Bronx address, apartment or house, are issued by the NYC Department of Buildings. Under DOB's kitchen guidance, swapping in new cabinets needs no permit, whereas a complex project may require plans by a licensed engineer or architect. Home improvement contractors in the city are licensed by NYC DCWP.

In Riverdale, about two-thirds of tax lots hold one- or two-family houses even though most units are in large buildings. LPC lists the Riverdale and Fieldston historic districts among the 13 in the Bronx, so a Riverdale house owner should begin with the address check described on the Riverdale page.

NTA figures are area profiles built from census tract estimates without margins of error. They describe a statistical area, not a particular building or street.

Planning a kitchen remodel in the Bronx? Call or email us to talk it through and arrange a consultation.

Call MMA Construction (516) 212-9311 Email us

Questions

Kitchen remodeling in the Bronx: questions

What do we prepare for a Bronx co-op board's kitchen review?
Typically a written scope, a layout drawing, the cabinet and appliance list, the trades who will do plumbing, gas and electrical work, and a schedule that respects the building's hours. If the work needs a DOB filing, the board usually wants to see that path as well. Requirements differ from building to building, so we work from your managing agent's checklist rather than a generic one.
Can an apartment kitchen get a dishwasher or a bigger range?
A dishwasher can often fit beside the existing sink, since it ties into the same supply and drain. A larger range, or a switch from gas to electric, depends on the apartment's electrical capacity and the building's rules. We ask the building for the service details and any appliance limits before you buy. DOB lists adding electrical outlets among work needing a permit, and that work requires an appropriately licensed electrician.
Is a kitchen in a Bronx house planned differently from one in an apartment?
Yes. In a house, you decide what moves, within what the structure and the pipes allow, and DOB is the main approval where the work needs a permit. In an apartment, the board decides first. House kitchens also show more of their own history: older wiring, galvanized supply lines and painted trim that may need lead-safe handling. We price those conditions as allowances rather than leaving them as surprises.
Does flood risk matter for a kitchen on City Island or in Throggs Neck?
It can, mainly where the kitchen is on a low first floor. Look up the address on FEMA's Flood Map Service Center, and read the city's NYC Flood Maps page, before choosing base cabinets, flooring and appliance positions. If the lookup shows a mapped flood area, we discuss moisture-tolerant materials and where the costliest equipment should sit.

Sources

  1. B25024 Units in Structure, Bronx County, ACS 2024 1-year estimates, U.S. Census Bureau via Census Reporter (2025 (ACS 2024 1-year release)). Accessed 2026-11-02.
  2. B25034 Year Structure Built, Bronx County, ACS 2024 1-year estimates, U.S. Census Bureau via Census Reporter (2025 (ACS 2024 1-year release)). Accessed 2026-11-02.
  3. B25024 Units in Structure and B25034 Year Structure Built, census tracts, ACS 2024 5-year (2020-2024), U.S. Census Bureau via Census Reporter API (ACS 2024 5-year release (acs2024_5yr)). Accessed 2026-11-08.
  4. 2020 Census Tracts to 2020 NTAs and CDTAs Equivalency, NYC Department of City Planning via NYC Open Data (rows updated 2021-09-20). Accessed 2026-11-08.
  5. 2020 Neighborhood Tabulation Areas (NTAs), NYC Department of City Planning via NYC Open Data (dataset (2020 NTA definitions)). Accessed 2026-11-08.
  6. Primary Land Use Tax Lot Output (PLUTO), version 26v2, NYC Department of City Planning via NYC Open Data (version 26v2 (rows updated 2026-08-24)). Accessed 2026-11-08.
  7. Historic Districts: Bronx, NYC Landmarks Preservation Commission. Accessed 2026-11-08.
  8. Lead Renovation, Repair and Painting Program Rules, U.S. Environmental Protection Agency. Accessed 2026-11-02.
  9. Lead-Based Paint, NYC Department of Housing Preservation and Development. Accessed 2026-11-02.
  10. Renovating Kitchens & Bathrooms, NYC Department of Buildings. Accessed 2026-11-02.
  11. Do I Need a Permit?, NYC Department of Buildings. Accessed 2026-11-02.
  12. License Checklist: Home Improvement Contractor, NYC Department of Consumer and Worker Protection. Accessed 2026-11-02.
  13. FEMA Flood Map Service Center, Federal Emergency Management Agency. Accessed 2026-11-02.
  14. NYC Flood Maps, City of New York. Accessed 2026-11-02.
  15. Resilient Neighborhoods: Edgewater Park, NYC Department of City Planning (October 2015). Accessed 2026-11-08.
  16. B25024 Units in Structure, B25034 Year Structure Built and B25003 Tenure, Census Tract 516.01, Bronx, ACS 2024 5-year (2020-2024), U.S. Census Bureau via Census Reporter API (ACS 2024 5-year release (acs2024_5yr)). Accessed 2026-11-08.
  17. Primary Land Use Tax Lot Output (PLUTO), version 26v2 (dataset 64uk-42ks), NYC Department of City Planning via NYC Open Data (26v2 (rows updated 2026-08-24)). Accessed 2026-11-08.

Talk to us about your kitchen project in the Bronx

Call or email us to talk it through and arrange a consultation.