Bathroom remodeling · The Bronx
Bathroom remodeling in the Bronx, apartment or house
We remodel bathrooms across the Bronx, from co-op and condo apartments in large buildings to one- and two-family houses in Throgs Neck, Pelham Bay, City Island and Riverdale. Most Bronx homes are in buildings of 20 or more units, so we first establish whose rules govern the room: the building's or the house's.
- Apartment bathrooms scheduled to the building's alteration agreement
- House bathrooms, with DOB filings where the plumbing work needs them
- Flood-map checks before a ground-floor bath in the east Bronx

Scope
Bronx bathroom work we take on
Every Bronx bathroom gets a written scope after a site visit, with the building's or the property's constraints listed beside the work they affect.
- Apartment bathroom renovations in co-op and condo buildings, after board approval
- Fixture-for-fixture replacement where a building limits plumbing moves
- Tub replacement and shower conversions in house bathrooms
- Floor waterproofing and drain details that protect the home below
- Exhaust fan replacement and controls matched to the room size
- Grab bars, step-in showers and shower seating for aging in place
Process
How MMA Construction & Remodeling runs a bathroom remodeling project
Written scope, written proposal, permits identified up front, and one project lead from start to finish.
Conversation
You describe the home and what you want to change. We ask about budget range and timing so expectations are clear early.
Site visit and scope
We look at the space, the structure of the house and any HOA, co-op or condo rules that apply, then write a scope of work.
Design and selections
Layout, materials and fixtures are agreed in writing before work is priced in full.
Written proposal
A written price and schedule for the agreed scope. Permits and any approvals are identified at this stage.
Build
One project lead coordinates the trades and keeps you updated. Some regulated work may require appropriately licensed specialty contractors.
Walkthrough
We review the finished work with you and resolve anything outstanding.
The Bronx
Bronx bathroom decisions by building type
In a large building, the board sets the terms
Around 61% of the borough's homes sit in buildings of 20 units or more. For an apartment, the alteration agreement usually governs working hours, the building's insurance requirements and approvals, and some buildings will not allow a toilet or shower to move over a neighbor's bedroom. We read the agreement first, design a bathroom that fits inside it, and prepare the scope description and drawings list that the managing agent asks for before review.
Risers, shutoffs and the apartment below
An apartment bathroom normally ties into vertical supply and drain risers that serve the units above and below it. Shutting a riser affects the neighbors, so many buildings control when it can happen and who operates the valves. Here the shower pan, the drain connection and the floor membrane carry more weight than usual, because a leak ends up in another family's home. We confirm the riser rules with the super or managing agent before anything is removed.
East Bronx houses and shoreline flooding
Roughly 69% of Throgs Neck-Schuylerville homes are one- or two-family, and about 60% predate 1960. City Planning reported in 2017 that Community District 10, which includes Throgs Neck, held nearly 80% of the Bronx's floodplain buildings. Before a basement or ground-floor bathroom is planned there, check the address on the FEMA and city flood maps. In Edgewater Park, a cooperative board sets architectural and construction guidelines, so ask for them early.
Riverdale and City Island houses
Riverdale counts mostly as large buildings when you tally units, yet most of its tax lots hold houses, so a Riverdale bathroom can follow either the apartment path or the house path. On City Island, roughly two-thirds of the housing units in the island's census tract were built in 1939 or earlier, and FEMA's 2015 preliminary map flags about a third of its residential lots. Old plumbing and a flood check both belong in a City Island bathroom brief.
Ready to scope a Bronx bathroom?
If you live in a co-op or condo, send the alteration agreement with your photos; if it is a house, tell us the neighborhood and the floor. We will set up a site visit and write the scope.
Local evidence
What Bronx records say about bathroom projects
| Place | Figure | Bathroom consequence |
|---|---|---|
| Bronx borough | about 61% of units in buildings of 20+ units | Board rules and shared risers come first |
| Throgs Neck-Schuylerville | 68.9% of units in one- or two-family buildings | House bathrooms with older pipes |
| Riverdale-Spuyten Duyvil | 2,022 of 3,054 lots with a one- or two-family class | Either an apartment or a house job |
| City Island (tract 516.01) | 1,474 of 2,191 housing units date from 1939 or earlier | Pre-war plumbing is likely |
| City Island (tract 516.01) | 375 of 1,198 residential lots on FEMA's 2015 map | Flood check before a ground-floor bath |
From Spuyten Duyvil to City Island, permits for a Bronx home are a matter for the city's Department of Buildings. DOB's own examples of work needing no permit include painting, new cabinets and floor resurfacing, while a more involved bathroom can require an engineer or architect to file plans. Plumbing work in the city belongs to a Licensed Master Plumber, and home improvement contractors working here hold a city DCWP license.
Around 76% of Bronx homes are in pre-1980 buildings. Under EPA rules, paid work disturbing paint in a home built before 1978 must follow lead-safe practices, so we open painted walls and ceilings in an older Bronx bathroom with containment and careful cleanup.
The Landmarks Preservation Commission lists 13 Bronx historic districts and designates individual landmarks on top of those. Use LPC's Discover NYC Landmarks map for the address before planning a new exhaust outlet or a different bathroom window. The Riverdale page covers the districts there, and the Throggs Neck page covers the cooperative land communities.
Planning a bathroom remodel in the Bronx? Call or email us to talk it through and arrange a consultation.
Questions
Bathroom remodeling in the Bronx: questions
Can I move the shower or toilet in my Bronx co-op apartment?
Who deals with the super and the managing agent during a Bronx apartment bathroom job?
Does a house in Edgewater Park need the co-op board's approval for a bathroom remodel?
Is a walk-in shower practical for an older relative in a Bronx apartment?
Keep exploring
Sources
- B25024 Units in Structure, Bronx County, ACS 2024 1-year estimates, U.S. Census Bureau via Census Reporter (2025 (ACS 2024 1-year release)). Accessed 2026-11-02.
- B25034 Year Structure Built, Bronx County, ACS 2024 1-year estimates, U.S. Census Bureau via Census Reporter (2025 (ACS 2024 1-year release)). Accessed 2026-11-02.
- B25024 Units in Structure and B25034 Year Structure Built, census tracts, ACS 2024 5-year (2020-2024), U.S. Census Bureau via Census Reporter API (ACS 2024 5-year release (acs2024_5yr)). Accessed 2026-11-08.
- 2020 Census Tracts to 2020 NTAs and CDTAs Equivalency, NYC Department of City Planning via NYC Open Data (rows updated 2021-09-20). Accessed 2026-11-08.
- 2020 Neighborhood Tabulation Areas (NTAs), NYC Department of City Planning via NYC Open Data (dataset (2020 NTA definitions)). Accessed 2026-11-08.
- Flood Resilience Zoning Text Update: Throggs Neck Homeowners Association presentation, NYC Department of City Planning (2017-09-26). Accessed 2026-11-08.
- FEMA Flood Map Service Center, Federal Emergency Management Agency. Accessed 2026-11-08.
- NYC Flood Maps, City of New York. Accessed 2026-11-08.
- Resilient Neighborhoods: Edgewater Park, NYC Department of City Planning (October 2015). Accessed 2026-11-08.
- Primary Land Use Tax Lot Output (PLUTO), version 26v2, NYC Department of City Planning via NYC Open Data (version 26v2 (rows updated 2026-08-24)). Accessed 2026-11-08.
- B25024 Units in Structure, B25034 Year Structure Built and B25003 Tenure, Census Tract 516.01, Bronx, ACS 2024 5-year (2020-2024), U.S. Census Bureau via Census Reporter API (ACS 2024 5-year release (acs2024_5yr)). Accessed 2026-11-08.
- Primary Land Use Tax Lot Output (PLUTO), version 26v2 (dataset 64uk-42ks), NYC Department of City Planning via NYC Open Data (26v2 (rows updated 2026-08-24)). Accessed 2026-11-08.
- PLUTO Data Dictionary (23v1.1), NYC Department of City Planning (2023-05). Accessed 2026-11-08.
- Do I Need a Permit?, NYC Department of Buildings. Accessed 2026-11-08.
- Renovating Kitchens & Bathrooms, NYC Department of Buildings. Accessed 2026-11-08.
- Project Requirements for Owner: Plumbing, NYC Department of Buildings. Accessed 2026-11-02.
- License Checklist: Home Improvement Contractor, NYC Department of Consumer and Worker Protection. Accessed 2026-11-02.
- Lead Renovation, Repair and Painting Program Rules, U.S. Environmental Protection Agency. Accessed 2026-11-02.
- Historic Districts: Bronx, NYC Landmarks Preservation Commission. Accessed 2026-11-08.
- Landmark Status Letter, NYC Landmarks Preservation Commission. Accessed 2026-11-08.
- Check for Safety: A Home Fall Prevention Checklist for Older Adults, U.S. Centers for Disease Control and Prevention (STEADI) (2017 (PDF history; customizable brochure)). Accessed 2026-11-08.
- Americans with Disabilities Act (ADA) Accessibility Standards, U.S. Access Board. Accessed 2026-11-02.
Talk to us about your bathroom project in the Bronx
Call or email us to talk it through and arrange a consultation.