MMA ConstructionConstruction & Remodeling Call MMA Construction

Brooklyn · local planning notes

Remodeling in Brooklyn Heights, the city's first historic district

The Brooklyn Heights Historic District was designated in 1965, the earliest date in LPC's list of districts, and in city lot data about 94% of the neighborhood's lots with homes sit inside a historic district. Before pricing a kitchen or bath, settle the landmark question and whether you own a house or a co-op apartment.

Part of our Brooklyn service area. Confirm the building authority for your exact address.

What this page covers

This page is for owners of rowhouses and townhouses in Brooklyn Heights, and owners of apartments in its co-op and condominium buildings, planning kitchen, bathroom or whole-interior work. Building permits come from the NYC Department of Buildings (DOB). Lot figures are for DCP's Brooklyn Heights neighborhood tabulation area (NTA, BK0201), a statistical area built from six census tracts, not an official boundary. Structural alterations, additions and new construction are outside the work this page describes.

LPC districts

Almost every home is in a historic district

Historic districts covering lots with homes in the Brooklyn Heights NTA (LPC dataset, accessed 2026-11-09; PLUTO 26v2 lot counts)
District (LPC number)DesignatedLots with homes (PLUTO)
Brooklyn Heights Historic District (LP-00099)November 23, 19651,179
Fulton Ferry Historic District (LP-00956)June 28, 19778
Borough Hall Skyscraper Historic District (LP-02449)September 13, 20116
All three1,193 of 1,264 (94.4%)

Brooklyn Heights carries the earliest designation date of the 141 districts in LPC's dataset. The 1965 designation report describes the Heights as an elevated plateau of brick and brownstone houses, and it names the kinds of renovation it wanted to stop: adding a full new story, removing front steps and rearranging windows so they no longer match their neighbors.

For a kitchen or bath, that means the interior is rarely the issue; what shows outside is. A new exhaust vent through a front or rear wall, a replaced window, a door to the garden or a rooftop condenser should be listed separately and checked on LPC's Discover NYC Landmarks map before anything is designed. LPC also lists interior work that needs a DOB permit among the work that needs its permit.

Whether an item in your plan needs an LPC permit is decided by LPC, not by this page.

What the lot data shows

A house and a co-op apartment are different jobs

Lots with homes in the Brooklyn Heights NTA by building type (PLUTO 26v2, accessed 2026-11-09)
Building type (DOF class)LotsHomes (units)Share of homes
One- and two-family (A, B)4927215.0%
Cooperatives (C6, C8, D0, D4)2025,55638.4%
Condominiums (R)652,36516.4%
All lots with homes1,26414,457100%

By lot count, almost two in five are one- and two-family houses; by homes, most people live in apartments, and about two-thirds of units are on lots with 20 or more units. So a Brooklyn Heights kitchen is either a house project, where the owner decides and LPC and DOB review, or an apartment project, where a co-op or condo board usually reviews the plan under its alteration agreement first.

In a house, the legal unit count matters too: HPD requires annual registration for a building with three or more units, or for a one- or two-family house where neither the owner nor the owner's family lives. Check the Certificate of Occupancy before planning.

Downtown Brooklyn zoning at the edge, and flood maps

PLUTO maps 75 of the NTA's lots with homes in the Special Downtown Brooklyn District. Its Zoning Resolution chapter deals with use, building bulk, street walls and parking, which shape buildings rather than kitchens; whether it touches a particular plan is a question for a design professional. Flood exposure is low: 7 lots with homes (0.6%) are flagged on FEMA's 2015 preliminary map. Year-built values before 1940 cover 94% of lots with homes; DCP says the field is accurate only to the decade.

Brooklyn Heights brief: what to write down

  1. The LPC map result for the address, and which district it is in.
  2. House or apartment; for an apartment, the alteration agreement and the managing agent's requirements.
  3. The legal unit count and floor-by-floor use on the Certificate of Occupancy.
  4. Items that show outside, listed separately: vents, windows, doors, rooftop equipment.
  5. Who lives in the building during the work, and which shutoffs affect them.

Room-by-room planning is on bathroom remodeling in Brooklyn, Brooklyn kitchen remodeling and home renovation in Brooklyn. Renovating an older home covers conditions behind old walls.

Permits

Who issues building permits

Every Brooklyn Heights address is in Brooklyn, so building permits come from NYC DOB. For a property in a historic district, LPC says its permit is needed before DOB can act. This page is not a permit, landmark or legal-use determination.

NYC Department of Buildings

Sources

  1. Do I Need a Permit?, NYC Department of Buildings. Accessed 2026-11-09.
  2. Landmark Status Letter, NYC Landmarks Preservation Commission. Accessed 2026-11-09.
  3. Permit Types, NYC Landmarks Preservation Commission. Accessed 2026-11-09.
  4. Historic Districts (dataset skyk-mpzq), NYC Landmarks Preservation Commission via NYC Open Data (rows updated 2026-06-18). Accessed 2026-11-09.
  5. Primary Land Use Tax Lot Output (PLUTO), version 26v2 (dataset 64uk-42ks), NYC Department of City Planning via NYC Open Data (26v2 (rows updated 2026-08-24)). Accessed 2026-11-09.
  6. PLUTO Data Dictionary (23v1.1), NYC Department of City Planning (2023-05). Accessed 2026-11-09.
  7. 2020 Census Tracts to 2020 NTAs and CDTAs Equivalency (dataset hm78-6dwm), NYC Department of City Planning via NYC Open Data (2021-09-20). Accessed 2026-11-09.
  8. The Newest New Yorkers 2026, Chapter 1, NYC Department of City Planning (2026). Accessed 2026-11-09.
  9. Register Your Property, NYC Department of Housing Preservation and Development. Accessed 2026-11-09.
  10. Brooklyn Heights Historic District Designation Report (LP-0099), NYC Landmarks Preservation Commission (1965-11-23). Accessed 2026-11-09.
  11. Zoning Resolution Article X, Chapter 1: Special Downtown Brooklyn District (DB), NYC Department of City Planning. Accessed 2026-11-09.

Questions

Common questions

Is every Brooklyn Heights house landmarked?
Almost. In city lot data, 94% of the neighborhood's lots with homes carry a historic-district name. Search the exact address on LPC's map.
Does LPC review an interior kitchen or bathroom?
LPC lists interior work that needs a DOB permit, and interior work that affects the outside such as vents, among work that needs its permit. LPC decides for a specific plan.

General planning information, not a permit determination for any property. Back to Brooklyn.

Local pages

Other local pages in Brooklyn

Ready to talk about your project?

Call or email us to talk it through and arrange a consultation.