Staten Island · local planning notes
Remodeling a house in Tottenville
Tottenville's houses fall into two very different groups. Over a fifth of units were built before 1940, and almost half were built in 1990 or later. That split should shape your brief more than the neighborhood name does. Some older houses here are designated city landmarks, and nearly every lot is in a special zoning district that protects trees and natural grades. This page is a planning draft. The area is planned and not open.
Part of our Staten Island service area. Confirm the building authority for your exact address.
What this page covers
This page is for owners of one- and two-family houses in Tottenville who are planning kitchen, bathroom, flooring or whole-house interior work. Structural work, additions, exterior and site work are not planned services. Service availability has not been established.
Neighborhood data
Two housing ages, two kinds of brief
| Measure | Share of housing units |
|---|---|
| One-family detached | 50.8% |
| One-family attached | 19.1% |
| Two-unit buildings | 21.7% |
| Built 1939 or earlier | 22.6% |
| Built 1940 to 1979 | 15.9% |
| Built in the 1980s | 13.3% |
| Built 1990 or later | 48.1% |
About 92% of units are in one- or two-family buildings. Compare the Great Kills-Eltingville area, also on the South Shore, where most units date from the 1960s to the 1980s. This area has a large pre-1940 group and a larger post-1990 group, with relatively little in between. Each group needs a different first conversation.
| Topic | Older house (before 1940) | Newer house (1990 or later) |
|---|---|---|
| Unknowns to budget for | Original or altered wiring, piping and framing; past work without records | Fewer unknowns; check what the original builder installed behind finishes |
| Paint | Built before 1978, so EPA lead-safe rules apply to paid work that disturbs paint | Not in the pre-1978 group |
| Typical decision | What to keep and repair versus replace | Whether a finish refresh is enough or the layout should change |
| Records | Look for DOB records and any landmark status first | Gather plans, appliance and fixture documents you already have |
| Guide | Renovating an older home | Cosmetic refresh vs full renovation |
Landmarks Preservation Commission
Individual landmarks: check before you plan
City lot data lists 19 tax lots with individual landmarks in this NTA, and 11 of them have a one- or two-family building class. None of its lots is tagged as being in a historic district. So designation here is house by house, and a neighbor's status tells you nothing about yours.
LPC says to search the address on its Discover NYC Landmarks map. If the house is designated, LPC says its permit is needed before DOB can act on a DOB application. LPC also lists interior work that needs its permit, including work that needs a DOB permit and interior work that changes the outside, such as new vents or louvers.
Special district
South Richmond rules for trees and grades
City Planning's background paper on Staten Island special districts lists Tottenville among the neighborhoods of the Special South Richmond Development District. City lot data tags 5,859 of the 6,225 lots in this NTA with it. The Zoning Resolution names keeping natural topography and trees undisturbed among the district's purposes. It defines a site alteration to include removing trees of six-inch caliper or more, regrading, excavating, filling and drainage changes, whether or not a DOB permit is needed.
The South Richmond rules were amended effective November 2, 2023, after a March 2023 City Planning proposal. Tree removal and grade changes are still regulated, with stricter rules on larger plan review sites and in designated open space; ask City Planning or a registered design professional before removing a tree or regrading the lot. For an interior project, the practical point is access. Don't plan a path, a debris container or a material drop that requires removing a tree or regrading part of the yard without checking first.
Flood maps
Check the exact address on FEMA's Flood Map Service Center and the city's NYC Flood Maps page. If it is in a special flood hazard area, DOB's rule asks every alteration application to state whether the work is part of a substantial improvement, meaning work whose cost reaches 50% of the structure's market value. Ask a design professional before fixing a large scope.
A brief for a Tottenville house project
- Note the year the house was built and which group it falls into.
- Check LPC's map for the address and the flood maps, and keep both results.
- List rooms, what stays and what changes. Mark anything that would need a new exterior vent or opening.
- Describe how materials and debris would reach the house without touching trees or grades.
- Ask bidders to price the same brief. See how to compare remodeling estimates and whole-home renovation: what first.
Scope examples: home renovation, kitchen remodeling, bathroom remodeling and flooring and painting.
Permits
Who issues building permits
DOB issues building permits in all five boroughs, including Tottenville. For a designated landmark, LPC says its permit is needed before DOB can act. In the South Richmond district, tree removal and site alterations have their own City Planning rules. Confirm the route for the exact address and scope. This is not a permit determination.
Sources
- 2020 Neighborhood Tabulation Areas (NTAs), NYC Department of City Planning via NYC Open Data (dataset (2020 NTA definitions)). Accessed 2026-11-08.
- 2020 Census Tracts to 2020 NTAs and CDTAs Equivalency, NYC Department of City Planning via NYC Open Data (rows updated 2021-09-20). Accessed 2026-11-08.
- B25024 Units in Structure and B25034 Year Structure Built, census tracts, ACS 2024 5-year (2020-2024), U.S. Census Bureau via Census Reporter API (ACS 2024 5-year release (acs2024_5yr)). Accessed 2026-11-08.
- Primary Land Use Tax Lot Output (PLUTO), version 26v2, NYC Department of City Planning via NYC Open Data (version 26v2 (rows updated 2026-08-24)). Accessed 2026-11-08.
- Zoning Resolution Article X Chapter 7: Special South Richmond Development District (107-00 General Purposes; 107-01 Definitions; 107-02, 107-03), NYC Department of City Planning / City Planning Commission (107-00 last amended 2024-08-15; 107-01 last amended 2024-12-05; PDF generated 2026-11-08). Accessed 2026-11-08.
- Staten Island Special Districts: Background and Goals (DRAFT), NYC Department of City Planning (April 2020 (marked DRAFT)). Accessed 2026-11-08.
- South Richmond Zoning Relief: Special South Richmond Development District, Proposal Summary, NYC Department of City Planning (March 2023). Accessed 2026-11-08.
- Landmark Status Letter, NYC Landmarks Preservation Commission (undated (notes a change effective 2023-03-06)). Accessed 2026-11-08.
- Permit Types, NYC Landmarks Preservation Commission. Accessed 2026-11-08.
- FEMA Flood Map Service Center, Federal Emergency Management Agency. Accessed 2026-11-08.
- NYC Flood Maps, City of New York. Accessed 2026-11-08.
- 1 RCNY 3606-01 Alteration applications; determinations of market value and substantial improvement (promulgated amendment), NYC Department of Buildings (amendment effective 2026-03-21 (original rule effective 2008-07-14)). Accessed 2026-11-08.
- Do I Need a Permit?, NYC Department of Buildings. Accessed 2026-11-08.
- Renovating Kitchens & Bathrooms, NYC Department of Buildings. Accessed 2026-11-08.
- Lead Renovation, Repair and Painting Program Rules, U.S. Environmental Protection Agency. Accessed 2026-11-08.
Questions
Common questions
Is Tottenville a historic district?
Does the South Richmond district affect an interior remodel?
My house is newer. Do I need to worry about lead paint?
Are Tottenville projects being accepted?
Services
Remodeling services in Staten Island
- Kitchen remodeling · Staten Island Kitchen remodeling for Staten Island houses Refresh or full remodel decided before design, with reasons in writing
- Bathroom remodeling · Staten Island Staten Island bathroom remodeling, from refresh to full renovation Refresh-or-renovate advice based on the room's condition, in writing
- Whole-home renovation · Staten Island Home renovation on Staten Island, from refresh to full interior A written room-by-room call on refresh versus full renovation
General planning information, not a permit determination for any property. Back to Staten Island.
Blog
Planning articles
- Whole-home planning · Draft How to prepare a useful renovation photo brief A short, organized set of photos and captions explains how you use a room and what you want answered. It starts a conversation; it is not a survey or a condition report.
- Whole-home planning · Draft Renovating a two-family home: separate the two project briefs Two units mean two sets of rooms, decisions and occupants. Writing them down separately, with a third list for what the units share, keeps the scope readable for everyone who prices or plans it.
Ready to talk about your project?
Call or email us to talk it through and arrange a consultation.